A couple of weeks back I was installing the concrete base for a new
green house. This base is approximately 3.5m but 2.5m but 10 cm at the
thinnest but about 30 cm at the thickest (to allow for the slope) the nearest
level place I could put the concrete mixer was about 20 - 30 meters away from
the site of the green house. this meant that all the liquid concrete had to be
carried in buckets 20 meters and up 35 steps ~ by me. By the end of the day I
was totally shattered and quite glad of my visit to the osteopath. This is the
first time I have had to do a job like this and I was hoping that I had done it
right, as I also had to build the greenhouse.
Well I have now more or less completed the greenhouse as well. This is
the first time I have built a green house so I didn't know how long it would
take, or quite how complicated it would be.
Overall I am pretty pleased with the results so far, and the customer is very happy. I still have to put in the automatic vent controls ( they have to be placed in a fridge for half an hour before being fitted) and there are a couple of things, like a replacement for the pane of glass that got broken, I am waiting for before I can really be finished.
Now I am feeling very tired, with a lot of aches and pains from lifting, stretching and getting into some pretty odd angles, so I am looking forward to another session with the osteopath tomorrow, I am definitely in need of the the ministrations.